$500 idea · Pattern break · Edition 026
Five business days of silence is worth 2.5¢ a kilowatt-hour.
26 CFR 1.45-8(f)(1)(i)(C), as finalised by TD 9998 on 25 June 2024, deems an apprenticeship request denied if the programme “does not respond within five business days,” and a deemed denial makes the taxpayer “deemed to satisfy the requirements of section 45(b)(8)(A) through (C).” The Federal Register of 4 September 2026, signed by Christopher T. Kelley, prices the difference between satisfying those requirements and not: 3.1¢ a kilowatt-hour against 0.6¢. The IRS built a checkbox for the silence. It is column (h) of Form 7220, Part V.
There is a standard story about the Inflation Reduction Act’s labour rules, and every part of it is about who can afford lawyers. The rules are described as a burden, a trap, a reason small developers stay out, a thing that gets priced into deals by people with compliance departments. That story is a claim about a document, and the document is four pages of regulation plus one IRS form that anybody can download.
What the document actually does is put a published federal price on paperwork. Section 45Y pays a base amount per kilowatt-hour and a five-times amount for a facility that satisfies prevailing wage and apprenticeship. For calendar year 2026, against an inflation adjustment factor of 2.0570, the Treasury published both numbers: 0.6 cents under section 45Y(a)(2)(A) and 3.1 cents under 45Y(a)(2)(B). The investment-side credit does the same thing in percentage points, 6% of qualified investment against 30%. The gap is not a subsidy for building something different. It is a subsidy for holding a record.
A megawatt of alternating-current capacity running at a quarter of nameplate produces 2,190,000 kilowatt-hours a year. At 2.5 cents of difference that is $54,750 a year, and the credit runs ten years, so one megawatt of documentation is $547,500. Across the 43.4 GW of solar the EIA has scheduled for 2026 the same 2.5 cents is $2.38 billion a year of credit that turns on whether somebody kept the file.
Now the apprenticeship half, which is the part that is genuinely strange. Section 45(b)(8) requires that 15% of total construction labour hours be performed by qualified apprentices from a registered programme for anything whose construction began after 31 December 2023, requires every contractor employing “four or more individuals” to employ at least one apprentice, and requires the daily journeyworker ratio to hold. Miss it and the cure is $50 per deficient labour hour, or $500 on a finding of intentional disregard.
Solve that backwards. A cure of $60,000 is 1,200 apprentice hours at $50, and 1,200 hours is 15% of a project with 8,000 construction labour hours. So a single mid-sized job that employed no apprentices at all owes the Treasury, to the dollar, the annual income this page exists to find. On a finding of intentional disregard the same job owes $600,000.
And then the exception. Regulation 1.45-8(f)(1)(i)(A) requires the initial request for apprentices to be made “no later than 45 days before the qualified apprentices are requested to start work,” and any subsequent request to the same programme “no later than 14 days.” Subparagraph (B) deems the taxpayer to satisfy the statute where the request is denied, “provided such denial is not the result of a refusal by the taxpayer” to meet the programme’s standards. Subparagraph (C) is the one nobody quotes: no response within five business days and “such request is deemed to be denied.” The deemed denial covers the requested period up to 365 days.
Read those three together and the apprenticeship requirement is not a hiring requirement. It is a correspondence requirement. The 15% is owed only by a taxpayer who never wrote the letter, or wrote it late, or wrote it to a programme that answered. The $60,000 cure above and the $0 cure are separated by a dated email and a calendar entry forty-five days out.
The IRS agrees, which is the strongest evidence here. Form 7220, revised December 2025, is the form that carries all of this onto the return, and its Part V is built for the exception rather than for the hiring: column (e) is hours needed, column (f) is hours “requested and denied,” column (g) is a box for a denial and column (h) is a box for “didn’t respond.” A federal tax form has a checkbox whose value, on one megawatt, is $547,500.
The prevailing wage half is priced the same way and cures the same way. Regulation 1.45-7(c)(1) sets the correction payment at the wage shortfall plus interest at the section 6621 rate “substituting ‘6 percentage points’ for ‘3 percentage points’,” and (c)(1)(ii) adds a penalty of “$5,000 multiplied by the total number of laborers and mechanics” underpaid — so twelve underpaid workers is $60,000, again the whole year. But (c)(6)(i) waives that penalty entirely if the correction is paid “by the last day of the first month that follows the end of the calendar quarter in which the failure occurred” and either the worker was short in “not more than 10 percent of all pay periods” or the shortfall is “not greater than 5 percent.” A quarterly review that catches a misclassification inside the quarter is worth $5,000 a head.
The inputs are free. DOL’s Wage and Hour Division publishes the determinations on SAM.gov, and where none fits, a supplemental determination is requested by email to IRAprevailingwage@dol.gov “no more than 90 days before the beginning of construction.” No fee, no licence, no examination, and no credential of any kind appears anywhere in TD 9998, in Form 7220 or on DOL’s page. The qualification to do this work is that you read the regulation and start the clock on time.
The counterweight is the One Megawatt Exception, and it is the reason this is a job at all. A facility “with a maximum net output of less than 1 megawatt (as measured in alternating current)” gets the 3.1 cents and the 30% without satisfying anything, and the Form 7220 instructions say plainly that such a taxpayer is “not required to file Form 7220.” So every project below the line needs none of this, every project above it needs all of it, and the discontinuity at exactly 1 MW is $54,750 a year. The second counterweight is that no public dataset posts what this service sells for; the fee counts below are stated at several price points and flagged as derived, not observed.
The evidence
7 findingsThe 2026 price of the paperwork, in print: 0.6¢ against 3.1¢
Signed by Christopher T. Kelley, Special Counsel (Energy, Credits, and Excise Tax). “The inflation adjustment factor for calendar year 2026 for purposes of the section 45Y credit is 2.0570,” and against it “the applicable amount provided in section 45Y(a)(2)(A) is 0.6 cents (or $0.006)” while “the applicable amount provided in section 45Y(a)(2)(B) is 3.1 cents (or $0.031).” The higher amount is reached three ways: by satisfying the prevailing wage and apprenticeship requirements, by beginning construction inside the sixty-day window after the original guidance, or by being a qualified facility “with a maximum net output of less than 1 megawatt (as measured in alternating current).” The investment-side analogue is the same multiple expressed as percentage points — the IRS’s own page for the section 48E credit states the base as “6 percent of the qualified investment” and the increase as “5 times or up to 30%.” Two numbers in the Federal Register, one of them five times the other, and the only difference between them for a facility above a megawatt is a record.
The requirement, and the exception that is a five-day silence
The labour hours requirement at (b)(2) is “10 percent in the case of a qualified facility, the construction of which begins before January 1, 2023,” “12.5 percent” for construction beginning after 31 December 2022 and “15 percent” for construction beginning after 31 December 2023. Paragraph (d) adds the participation requirement to every taxpayer, contractor or subcontractor “who employs four or more individuals to perform construction, alteration, or repair work,” and (c)(2) requires “the allowable ratio of apprentices to journeyworkers on the job site in any occupation” under 29 CFR part 29. Then paragraph (f), the Good Faith Effort Exception. The initial request “must be made no later than 45 days before the qualified apprentices are requested to start work,” and a subsequent request to the same programme “no later than 14 days.” Under (f)(1)(i)(B) a denial makes the taxpayer “deemed to satisfy the requirements of section 45(b)(8)(A) through (C),” “provided such denial is not the result of a refusal by the taxpayer” to comply with the programme’s standards. And under (f)(1)(i)(C), where the programme “does not respond within five business days after the date on which such registered apprenticeship program received the taxpayer’s” request, “such request is deemed to be denied.” The deemed denial covers the requested period “but not exceeding 365 days (366 days in case of a leap year).” There is no standalone recordkeeping mandate in the section; failure to “maintain and preserve records sufficient to establish compliance” appears instead at (f)(2)(ii)(C)(13) as one of the factors in finding intentional disregard, which is what turns $50 an hour into $500.
A penalty of $5,000 a head that a quarterly review erases
The correction payment at (c)(1)(i) is the wage shortfall plus interest at the section 6621 federal short-term rate, “substituting ‘6 percentage points’ for ‘3 percentage points’ in section 6621(a)(2).” The penalty at (c)(1)(ii) is “$5,000 multiplied by the total number of laborers and mechanics” underpaid for any period during the year. On intentional disregard — defined at (c)(3)(ii) as a failure that “is knowing or willful” — the correction payment “is increased to three times” and the penalty to “$10,000 multiplied by the total number of laborers and mechanics.” The whole penalty disappears under (c)(6)(i) where the correction payment is made “by the last day of the first month that follows the end of the calendar quarter in which the failure occurred” and either the worker was underpaid for “not more than 10 percent of all pay periods of the calendar year” on that facility, or the total shortfall “is not greater than 5 percent of the amount required to be paid.” Two further reliefs sit beside it: (c)(6)(ii) removes the penalty altogether for work performed under a qualifying pre-hire collective bargaining agreement if corrections are made by the date the increased credit is claimed, and (c)(6)(iii) is a transition waiver for work between 29 January 2023 and 25 June 2024 corrected within 180 days. Nothing in the paragraph is discretionary and none of it requires a representative, an appeal, or a negotiation. It is a deadline and a cheque.
The federal government printed a checkbox for “didn’t respond”
Form 7220 is filed separately for each facility by a taxpayer claiming the increased amounts, and it rides behind Forms 3468, 7205, 7210, 7211, 7213, 7218, 8835, 8908, 8911 and 8933. Part II reports wages, hours and fringe benefits by classification. Part III, column (i): “Multiply column (h) by $50 and enter the result in column (i).” Part IV, column (f): “Multiply column (e) by $5,000 and enter in column (f).” Part V is the Good Faith Effort Exception and it is laid out as a correspondence log rather than a payroll: column (d) is “the number of qualified apprentices you requested,” column (e) “the number of hours needed to satisfy the Regulations section 1.45-8(b) labor hours requirement,” column (f) “the number of hours for which qualified apprentices were requested and denied,” column (g) a box to “check this box if the Registered Apprenticeship Program denied or partially denied the request,” and column (h) a box to “check this box if the Registered Apprenticeship Program didn’t respond to the apprentice request.” And the exemption that defines the market: “If you’re claiming the increased credit or deduction amounts and satisfy the BOC or the One Megawatt exception, you’re not required to file Form 7220.” A separate form is also required for ongoing prevailing wage compliance on alterations or repairs to facilities placed in service in a prior year — which is the part that makes this recurring revenue rather than a one-off.
The inputs cost $0 and the agency that publishes them does not enforce them
DOL states the division of labour plainly: “The Inflation Reduction Act’s prevailing wage requirements are implemented by the IRS,” while the Wage and Hour Division publishes the rates. Determinations are the ones “published by the Wage and Hour Division of the U.S. Department of Labor on www.sam.gov,” and a taxpayer “should first consult www.sam.gov to identify the applicable wage determination.” Where no general determination fits, a supplemental one is requested by email to IRAprevailingwage@dol.gov “no more than 90 days before the beginning of construction, alteration, or repair,” or as soon as practicable afterwards, and the request must carry the requester’s name, the applicable general determinations, a description of the work, the geographic area, the start date, the classifications and duties needed and the proposed rates including fringes; WHD denies it if a general determination already covers the classification. The same page restates the economics from the other side of the government: five times the base amount, a one-megawatt exception, a sixty-day window, $5,000 per affected worker for a wage failure and $50 per labour hour for an apprenticeship failure “rising to $500 per hour for intentional disregard.” No fee is charged for a determination, no registration is required to request one, and no credential of any kind is named.
The 2026 build above the line: 43.4 GW of solar inside 86 GW
EIA expects 86 GW of utility-scale generating capacity to come online in 2026, of which solar is 43.4 GW and 51%, battery storage 24 GW and 28%, wind 11.8 GW and natural gas 6.3 GW. The relevance is arithmetic rather than atmospheric: the One Megawatt Exception means the entire Form 7220 universe sits above 1 MW, and utility-scale capacity is by definition the part of the build that is there. Chipped as reported rather than verified for one reason — the article does not itself state the 1 MW definition of utility-scale, and it reports planned capacity rather than a count of facilities, so it sizes the pool of megawatts and not the pool of clients. Against that pool the 2.5-cent differential is $2,376,150,000 a year of credit on the 2026 solar cohort alone, computed at a 25% capacity factor, which is the number the entire compliance trade is being paid out of.
12 facilities a year, and the plotted points behind the figure
The chart first. Horizontal scale 1 px = 5 kW of AC capacity across 3 MW, vertical 1 px = $750 of annual credit across $240,000, origin (90, 380); x = 90 + 200C where C is megawatts, y = 380 − V ÷ 750. Energy per megawatt-year at a 25% capacity factor: 1,000 kW × 8,760 h × 0.25 = 2,190,000 kWh. At 3.1¢: 2,190,000 × $0.031 = $67,890 per MW-year → at 1 MW (290, 289.48), at 3 MW 3 × 67,890 = $203,670 → (690, 108.44). At 0.6¢: 2,190,000 × $0.006 = $13,140 → (290, 362.48), and 3 × 13,140 = $39,420 → (690, 327.44). The shared segment below the exception runs (90, 380) to (290, 289.48). The cliff is the vertical from (290, 289.48) to (290, 362.48): $54,750 a year, −80.65%, for one additional kilowatt of nameplate, and over the ten-year credit period $547,500. The gap is linear in capacity at $54,750 per MW, so it equals $60,000 at 60,000 ÷ 54,750 = 1.0959 MW → x = 309.18, bracketed between y 280.80 ($74,401) and y 360.80 ($14,400), a span of exactly 80 px = $60,000. At 3 MW the gap is $203,670 − $39,420 = $164,250. Now the cures. Apprenticeship: $60,000 ÷ $50 = 1,200 deficient apprentice hours, and at the 15% rate 1,200 ÷ 0.15 = 8,000 total construction labour hours — so the project whose cure payment is exactly a year of $5,000 a month is an 8,000-hour job that employed no apprentices, and on intentional disregard 1,200 × $500 = $600,000. Prevailing wage: $60,000 ÷ $5,000 = 12 underpaid workers, or 6 on intentional disregard at $10,000. Now the income, and this is the soft part. $5,000 a month is $60,000 a year, so the facility counts are 12 at a $5,000 annual fee per facility, 24 at $2,500, 48 at $1,250 and 60 at $1,000. At $5,000 the fee is 9.13% of the first-year differential on a single megawatt and 0.913% of the ten-year differential. For scale: twelve 1 MW facilities is 12 MW, 0.0276% of EIA’s 43.4 GW of 2026 solar and 0.0140% of the 86 GW total; the differential across that solar cohort is 43,400,000 kW × 8,760 × 0.25 × $0.025 = $2,376,150,000 a year. Five things are not hardened. No public dataset posts what PWA documentation sells for, so the $5,000, $2,500 and $1,000 price points are stated as arithmetic and not as observed market prices — this is the single largest unknown on the page and it is the same shape as the unsourced adjuster split in edition 025. The 25% capacity factor is an assumption applied uniformly; it scales every dollar figure linearly and none of the ratios. EIA reports megawatts, not facilities, so the client count is not derivable from it. Form 7220’s burden is folded into OMB control numbers 1545-0074, 1545-0047, 1545-0123 and 1545-0092 rather than carrying its own, so there is no federal count of how many facilities file it. And the binding one: a taxpayer claiming the increased amount signs the return, so the work is sold to someone who keeps the liability — which is why it is a documentation fee and not a contingency on the $547,500.
The ladder
From $500 to $5,000 a monthSeven rungs. The product is a correspondence file, priced by a Federal Register notice at 2.5 cents a kilowatt-hour.
-
Read the two regulations before you buy anything
26 CFR 1.45-7 and 1.45-8, finalised by TD 9998 on 25 June 2024, are the whole trade. One prices wage failure at $5,000 a head, the other prices apprenticeship failure at $50 an hour, and both contain an exception that costs nothing to use if you start on time.
TD 9998 · 89 FR 53184 · 25 Jun 2024 · $0 -
Work only above one megawatt
A facility under 1 MW AC takes 3.1¢ and 30% without satisfying anything and is “not required to file Form 7220.” Everything below the line is somebody else’s market and there is no fee to be earned in it. The discontinuity at exactly 1 MW is $54,750 a year.
<1 MW = $0 of work · 1 MW = $54,750/yr at stake -
Put the 45-day letter on the calendar first
The initial apprenticeship request must go out “no later than 45 days before the qualified apprentices are requested to start work,” subsequent requests 14 days. Miss the date and the exception is gone and the 15% is owed in cash. This single calendar entry is the deliverable.
45 days initial · 14 days subsequent · 365-day cover -
Count the five business days and keep the silence
No response within five business days and “such request is deemed to be denied,” and the taxpayer is “deemed to satisfy” the statute. The evidence is a dated send, a dated non-answer and column (h) of Part V. Nothing has to be hired for the requirement to be met.
5 business days → deemed denial → Form 7220 Pt V (h) -
Review payroll once a quarter, not once a year
The $5,000-a-head penalty is waived entirely where the correction is paid “by the last day of the first month that follows the end of the calendar quarter” and the shortfall is under 10% of pay periods or 5% of the amount owed. A review inside the quarter is worth $5,000 per worker; the same review in April is worth nothing.
Quarter + 1 month · 10% / 5% · $5,000 a head waived -
Pull the wage determinations from SAM.gov for nothing
DOL publishes every determination on SAM.gov and issues a supplemental one by email to IRAprevailingwage@dol.gov when no classification fits, requested “no more than 90 days before the beginning of construction.” There is no fee, no registration and no credential. Your input cost is reading time.
SAM.gov $0 · supplemental by email · 90-day window -
Price the file, not the credit, and sell the repeat
A separate Form 7220 is required for ongoing compliance on alterations and repairs to facilities placed in service in earlier years, so a facility signed once is a facility billed every year the credit runs. Twelve of them at $5,000 is $60,000 — 9.13% of what one megawatt of documentation is worth in its first year.
12 × $5,000 = $60,000 · 9.13% of $54,750
Sources
7 primary documents- IRS, Publication of Inflation Adjustment Factor and Applicable Amounts for Clean Electricity Production Credit for Calendar Year 2026, 91 FR 56942, published 4 September 2026, signed Christopher T. Kelley
- 26 CFR 1.45-8, Apprenticeship requirements (TD 9998, 89 FR 53184, published 25 June 2024, effective 26 August 2024)
- 26 CFR 1.45-7, Prevailing wage requirements (TD 9998)
- IRS, Instructions for Form 7220, Prevailing Wage and Apprenticeship (PWA) Verification and Corrections, Rev. December 2025 (instructions dated 7 January 2026)
- U.S. Department of Labor, Wage and Hour Division, Prevailing Wage and the Inflation Reduction Act, checked 11 October 2026
- U.S. Energy Information Administration, Today in Energy, 20 February 2026, from the Preliminary Monthly Electric Generator Inventory, December 2025
- IRS, Clean Electricity Investment Credit (section 48E base 6%, increased 5 times or up to 30%)
Every morning, by email
Get one primary-sourced $500 capital analysis in your inbox every morning. No ads, no courses.
Prefer a feed reader? Follow by RSS.
We email a link to confirm first, and every email has a one-click unsubscribe. Sent by Rocky Software Inc., 213 McKean Drive, Stouffville, ON L4A 5E2, Canada.